PM*** F5 December 2014 Exam was.. Instant Poll and comments ***
I think it's correct
how do you all even remember all this.
Memory :-) credit goes to bdaam haha
I had exactly the same answers. And i have choose products D and B. Hope everything will be ok
For the price penetration question: when demand is inelastic, the quantity demanded falls by a smaller percentage than the percentage increase in price. Hence this is okay with penetration pricing. I put all three as the answer. For the eee question I put 123
On relevant costing question:
- factory o/h costs are listed separate to Admin o/h costs, and are allocated to labour hrs. So assumed factory costs to be variable (electricity, eqpt maintenance etc) and included $1.50 per labour hour. Also included super's OT but not the 1.50 per hour for his regular pay which is a sunk cost.
- the wood is in continuing use but there isn't enough to do the extra order as well as regular production in the time frame given for the order. They're short by 30 sq m so they have to buy that at the immediate price of 8.50. The other 20 sq m will be replenished in their regular order.
- fabric is at replacement cost
- skilled labour 50 hrs at OT rates, 150 hrs sunk cost
- semi-skilled labour at the agency rate of $14/hr rather than OT rate of $16/hr for reg employees (lower rate is relevant unless there is some reason given that they must use their own employees, like union agreement)
- gen admin costs assumed budgeted for regular production and not relevant
Robert anthony and unchanged standard ans please?
the MCQ union strike question asks for profit maximising use of available labour. Although the shortage is temporary, it still creates a bottleneck. So using contribution per labour hour, D then A.
wohoo badaam.
MCQ was ok, struggled to complete questions in section b. need better time management.
@super_vegito said: did anything matched from the guesses ? and were the mcqs smiliar tobpp kit .. please reply on my email . nox_shadow1990@yahoo.com .. got f7 coming up
What about abc costing:
A) cost drivers cause cost to alter
B) in traditional costing higher volume of production means lower allocated oh
Both are right
And on environment costing:
A) acc systems tends to capture environment costs,but the challange is to identify
B)input\output system divides environment cost in to three parts (dont remmember which ones)
Only a) right, huh?
i thought so too
in traditional costing higher volume of production means HIGHER allocated
Chris: Are you sure for question abt throughput?If you're right so you think how many marks I can get for this question. I am wrong when ignore three senior stylist.
Question 2 of part B made me worried because I got both TPAR near to 0.5
Manager salary was not a good option because it was giving loss of 1300.
Im throuhput mcq, the option was to make D and A. In that we got to deduct fix cost from profit to get contribution per unit and then divide it to labour hours to get factory return per bottleneck.
I suppose option d and a were correct,mi judt calculated contribution for ea ch of them and divided by labor hours. Considering Tpars, even if we get it wrong, we should be awarded partial credits
Mate, 20 should not be replenished. Questition stated that out of 500 available units only 480 are used in regular production
What was the answer for breakeven units? The answer for shadow price was 16
What was da ans to variance ques ? I got total material mix as Adverse & total material yield as Fav ...
Did anyone have these answers in the MCQs.
RI - Division A invest only.
ABC 46.25
Hi LO - 3200 + 8x
Life cycle - all of them
EV - Don't hire manager as making a loss of $1,300
Budgeting - incremental
3 E's - 1,2,3
Very hard to remember what was asked. I got a lot wrong, they were tricky :-(
Section B Q1 learning curve ,, guys whats da final ans (price of da product) which ull got ? i got $350.
I hink the answer was 400 something
Do not agree with you on high low and 3 es
The 3es answer was D-1,2,3. Got same for the high low question 3200+80x
Please can anyone help with the mix variance question?
Lye 0.25kg/unit@$10/kg
Coconut oil 0.6kg/unit @ $4/kg
Shea butter 0.5kg per unit @$3/kg
Budgeted batches 120k, actual 136kg. Can't remember the actual mix but it totaled 181512kg
Yes, for 3es the answer was D
High low was 52x
The easiest question so far how did you get 8x???
Everyone, post your answers on high low
Scorecard, my answer
Customer - Goal - Arrival on time - Measure - Rank in agency
Internal - Goal - Cancelled flights - Measure - Rate of idle time (another title, but the same mean)
Learning and innovation - Goal - Clean in airline - Measure - Customer survey
Financial - Goal - Passenger on flight- Measure - Total passenger/Total flights
May be wrong at all, but have a fun ))))