PM*** F5 March 2016 Exam was.. Instant Poll and comments ***

Oopentuition_teamAdmin10y ago

Please vote in our Instant Polls about the F5 March 2016 Exam.

*** F5 March 2016 Exam was.. Instant Poll and comments *** poll results *** F5 March 2016 Exam was.. Instant Poll and comments *** poll results *** F5 March 2016 Exam was.. Instant Poll and comments *** poll results Post your comments about F5 exam below
OOmair10y ago#31
sorry yea its 0.8 ..but with same method!
NNick10y ago#32
@wingman0401 said: The patent cost was $200,000 and cost $500,000 to get the contract started. I used only two lots of $200,000 as it seemed unfair to assign costs that wouldn't be related to that product. The question stated that the company was going to continue making even better shoes, so I figured using all 10 years on just that one product was incorrect. Happy (ish) to be proven wrong, though,
I only attributed one years renewal as it would only have had to have been renewed once in 2 years
AAnshu10y ago#33
2 questions I was 5 minutes late I went to the living room I think I had much stress and need calm myself :/ when I got inside the people told me that they need to report that.... When are the official answers published in the ACCA website?
AAnshu10y ago#34
@wingman0401 said: Taken from the ACCA site; "image and relationship costs: costs that, by their nature, are intangible, for example, the costs of preparing environmental reports." That to me reads as though relationship would be right but mine was a guess, anyway.
yeah mine too I think that part was not even in my notes so no idea :/
OOmair10y ago#35
MCQ: one was (ABC factors ans. was i-inspection batches ii-setup cost) one was ABC question was on, quality control cost and setup cost one was protection of data through logical control - antivirus, usage policy, encryption,
MMMd Mohiuddin Robel10y ago#36
@robelacca said: mcq 1.C 2.A 3.C 4.A 5.D 6.D 7.B 8.D 9.D 10.D 11.C 12.C 13.A 14.C 15.C 16.D 17.D 18.B 19.B 20.D
Ss@min@10y ago#37
MCQ: 1 a 2 a 3 c 4 b 5 d 6 b 7 b 8 d 9 a 10 b 11 a 12 a 13 a 14 c 15 a 16 d 17 a 18 b 19 c 20 c
LLou10y ago#38
i like your logic on that one... my logic said that they were all valid which obviously wasn't correct so i excluded internet usage policy and segregation of duties and just went for "electronic options"
Former userFormer user10y ago#39
I think 2.27 some thing..
CCee10y ago#40
What was your calculation for the Labour rate: I think i calculated 14 and with the increase it became 14.35 or something along those lines
NNick10y ago#41
@wingman0401 said: What did everyone go with on the security of data? I said it was three of the four, excluding segregation of duties. In my mind, the more people that have access, the less safe it is... That was my logic behind it anyway.
I went with that initially but crossed it out and went with just the first two, thinking that an internet usage policy isn't a control as there is no control over it, it can simply guide people or coerce people into safer online usage. I hate ambiguous MCQs, at least in a written question you can justify your answer and argue your case...
AAnshu10y ago#42
What about the variances? I got both positive
TTrishul10y ago#43
I didn't include the technology cost for LCC as this related to another product. The question wanted the cost for two year period for the original pair of shoes or whatever? Also, are fixed costs included? I am pretty sure that Life Cycle Costing includes ALL the costs incurred during the product life cycle.
AAnshu10y ago#44
and ROI?? I got something around that the manager woulnt get it because although it was positive it was less than the figure that was in 2016
Aalison10y ago#45
What about lost contribution in life cycle costing, should that have been included? I didn't include it. Q5 was so hard!
KKaranpreet10y ago#46
i only did overall roi 36% with included the project. dint do for previous year because i thought it wasnt asked with or without??? so i just did with new project and it came 36%
PPslana10y ago#47
What about relevant cost of contract? I calculated materials and variable cost in it and ended up with 18k and you?
PPslana10y ago#48
My ROI 2016 was 23%, in 2017 it was 22%.
AAnnemarie10y ago#49
For no. 5 - labour rate variance, did you have to do $42 / 3 hrs = $14 x 37000hrs?? For no.1 i chose 4 batches also = $14,400 profit. For no.3 i included the opportunity cost since in LCC you have to include all the costs - but im not sure if i did it right..
CCee10y ago#50
Yes I calculated a Labour rate of 14. I also got both adverse overall with one favourable Labour efficiency and unfavourable Labour rate for the operational and both unfavourable at planning What did you get for ROI
AAnnemarie10y ago#51
I dont remember must since we had to assess the performance ..mine operational came both favourable i think..but the first labour rate came adverse and i mentioned that he employed highly skilled workforce which resulted in adverse rate but then compensated for the efficiency which was favourable... Roi i dont remember:( but i did include depreciation in my working = 4200-200/5 yrs
AAnshu10y ago#52
@pslana2015 said: My ROI 2016 was 23%, in 2017 it was 22%.
Yes I think it was sth like but 2017 was lower at least for me :)
AAnshu10y ago#53
@christa316 said: Yes I calculated a Labour rate of 14. I also got both adverse overall with one favourable Labour efficiency and unfavourable Labour rate for the operational and both unfavourable at planning What did you get for ROI
For me both were favorable because I consider 12,600 so then u got like top consider the increase of 15 mins then it was the increase in the salary so it was 42.84 which was lower than the 39k they mentioned i think the vcariance was for 31k
AAnshu10y ago#54
@christa316 said: Yes I calculated a Labour rate of 14. I also got both adverse overall with one favourable Labour efficiency and unfavourable Labour rate for the operational and both unfavourable at planning What did you get for ROI
Yes I think it was sth like but 2017 was lower at least for me :)
GGeorge10y ago#55
@nickg2004 said: I only attributed one years renewal as it would only have had to have been renewed once in 2 years
I did this too: Start of year one: patens cost Start of year two: renewal cost Start of year 3: renewal due but not relevant for the product
GGeorge10y ago#56
@wingman0401 said: What did everyone go with on the security of data? I said it was three of the four, excluding segregation of duties. In my mind, the more people that have access, the less safe it is... That was my logic behind it anyway.
Yes, agreed. That was one of my bankers :)
GGeorge10y ago#57
@wingman0401 said: That was almost my thinking, too. I suppose internet usage sounds rather silly now...
My thinking was that without an internet usage policy the company opens itself up to the threat of virus but I'm not so sure now
SSaph10y ago#58
@pslana2015 said: What about relevant cost of contract? I calculated materials and variable cost in it and ended up with 18k and you?
I also picked the option with 18k, as I didn't include the labour costs and I didn't do anything with the supervisor's costs.
SSaph10y ago#59
@christa316 said: Yes I calculated a Labour rate of 14. I also got both adverse overall with one favourable Labour efficiency and unfavourable Labour rate for the operational and both unfavourable at planning What did you get for ROI
I got the same labour rate of 14. For the labour rate variances did you get a revised rate of $14.28? (2% increase). I also got revised labour hours of 3.25, so both my planning variances (for rate and efficiency) were adverse. Do you remember what comments you put about the manager performance? I sort of rushed my answer but I referred to the planning variances not being the manager's responsibility, and that they should get credit for a favourable operational efficiency variance.
KKaranpreet10y ago#60
any one got mcq answers?