Skip to contentSkip to search

Accounting for other expenses

1 Introduction

This chapter looks at how fixed overheads are accounted for.

2 Charging indirect costs to cost centres and cost units

You should remember from an earlier chapter that there are two ways of calculating the cost of a product:

Marginal costing.   Here, only direct material, labour and expenses are traced to units.

Total absorption costing.   Here, in addition to marginal costs, indirect production costs (production overheads, both fixed and variable) are also included in the cost of units.

There is little problem in theory with arriving at the marginal costs because the material and labour inputs can be measured directly (eg kilograms and hours) and specific costs worked out.

Including fixed costs production overheads is more difficult because making one more unit does not cause any more of these costs. The approach used is to work out a fixed overhead absorption rate based on:

Budgeted fixed production costs/Budgeted production in units

The first challenge is to calculate the fixed production costs relating to each production department.

Cost allocation:   where the whole of a cost can be traced to a single department.

Cost apportionment:   where a cost has to be divided over several departments.

Apportionments are done on a common sense basis. For example:

Heating costs   apportioned on the basis of floor area

Insurance of machines   apportioned on the basis of machine value

Rent   apportioned on the basis of floor area

Canteen costs   apportioned on the basis of the number of people employed.

Practice question

Which of the following would be the most suitable way of apportioning depreciation of plant and machinery?

Practice question

Which of the following could be suitable ways of apportioning maintenance of plant and machinery?

1. Number of hours the machinery runs for

2. Number of machines

3. Book value of the machinery

4. Cost of the machinery

Practice question

If an entire cost can be related to a department, then the cost is said to be:

A factory has two production departments: preparation and assembly, and one canteen for the labour force.

Statistics about the departments are:

Preparation

Assembly

Canteen

Floor area

400 m2

500 m2

100m2

Machine value

$94,000

$80,000

$6,000

Employees

8

6

2

Power consumption

75%

20%

5%

Fixed overhead costs are: rent $45,000, insurance $5,400, canteen costs $12,000, electricity $40,000

Show how the costs would be apportioned to each department.

Show answerHide answer

Example 1

Cost

Basis of apportionment

Total

Preparation

Assembly

Canteen

Rent

Floor area 4:5:1

45,000

18,000

22,500

4,500

Insurance

Machine value 94:80:6

5,400

2,820

2,400

180

Canteen

Employees 8:6:2

12,000

6,000

4,500

1,500

Power consumption

75%,20%,5%

40,000

30,000

8,000

2,000

Total

102,400

56,820

37,400

8,180

Once the amounts are apportioned the cost in each department will be:

Cost

Basis of apportionment

Total

Preparation

Assembly

Canteen

Rent

Floor area 4:5:1

45,000

18,000

22,500

4,500

Insurance

Machine value 94:80:6

5,400

2,820

2,400

180

Canteen

Employees 8:6:2

12,000

6,000

4,500

1,500

Power consumption

75%,20%,5%

40,000

30,000

8,000

2,000

Total

102,400

56,820

37,400

8,180

The canteen is a production-related cost because it is used to provide meals to the workforce. It is known as a service department. However, units being produced spend time only in the preparation and assembly departments. Therefore, to account for canteen costs they must be re-apportioned into the preparation and assembly departments (secondary apportionment).

This will be done on the basis of the number of employees in each of those departments ie 8:6

Cost

Basis of apportionment

Total

Preparation

Assembly

Canteen

Rent

Floor area 4:5:1

45,000

18,000

22,500

4,500

Insurance

Machine value 94:80:6

5,400

2,820

2,400

180

Canteen

Employees 8:6:2

12,000

6,000

4,500

1,500

Power consumption

75%,20%,5%

40,000

30,000

8,000

2,000

Total

102,400

56,820

37,400

8,180

Reapportionment of service department costs

8:6


4,674

3,506

(8,180)

Final apportionment

102,400

61,494

40,906

–

The costs now have to be traced into (or charged) to items being produced. If there is only one type of item being produced then the costs per item would simply be the total costs spread over the items. This would be known as a fixed overhead absorption rate per unit.    

However, often a mix of items is produced, and the normal approach is to charge overheads on the basis of the amount of time that the items spend in each department. It is assumed that there is a correlation between spending time in a department and benefitting from what goes on there.

Allocate an overhead when it belongs wholly to one cost centre. Apportion it when several centres share the benefit. Absorb the resulting production-centre total into cost units using the stated activity base. These verbs describe different stages, not interchangeable methods.

When a service department is shared in a stated ratio, distribute its cost by the ratio’s total parts, add the recipient share to that production department’s overhead, and only then divide by its own activity level. Common errors are ignoring the service cost, using half by default, or reversing the ratio.

The time can be estimated using:

  • Labour hours:   this will give a fixed overhead absorption rate per labour hour

  • Machine hours:   this will give a fixed overhead absorption rate per machine hour

Assume the following;

Preparation department

Assembly department

Product

Budgeted volume

Machine hours per unit

Labour hours unit

Machine hours per unit

Labour hours unit

Product A

10,000 units

2

2.5

1

3

Product B

6,000 units

3

1

1

4

Machine hours basis

Budgeted machine hours in the preparation department

  10,000 x 2 + 6,000 x 3 = 38,000

Budgeted machine hours in the assembly department

  10,000 x 1 + 6,000 x 1 = 16,000

Fixed overhead absorption rate per machine hour in the preparation department

  = 61,494 [the apportioned costs]/38,000 = $1.62/hour

Fixed overhead absorption rate per machine hour in the assembly department

  = 40,906 [the apportioned costs]/16,000 = $2.56/hour

Fixed overheads charged to Product A:

  Preparation 2 x 1.62 + Assembly 1 x 2.56 = $5.80

Fixed overheads charged to Product B

  Preparation 3 x 1.62 + Assembly 1 x 2.56 = $7.42

Re-calculate the overhead absorption rates and amount to be charged to each product using a labour hour basis.

The required information is below;

Costs apportioned into preparation department = $61,494

Costs apportioned into assembly department = $40,906

Preparation department

Assembly department

Product

Budgeted volume

Machine hours per unit

Labour hours unit

Machine hours per unit

Labour hours unit

Product A

10,000 units

2

2.5

1

3

Product B

6,000 units

3

1

1

4

Show answerHide answer

Example 2

Costs apportioned into preparation department = $61,494

Costs apportioned into assembly department = $40,906

Preparation department

Assembly department

Product

Budgeted volume

Machine hours per unit

Labour hours unit

Machine hours per unit

Labour hours unit

Product A

10,000 units

2

2.5

1

3

Product B

6,000 units

3

1

1

4

Total budgeted labour hours in preparation department = 31,000

Overhead absorption rate/labour hour in preparation = 61,494/31,000 = $1.98

Total budgeted labour hours in assembly department = 54,000

Overhead absorption rate/labour hour in assembly = 40,906/54,000 = $0.76

Product A overheads: 2.5 x 1.98 + 3 x 0.76 = 7.23

Product B overheads: 1.0 x 1.98 + 4 x 0.76 = 5.02

3 More on the process of cost absorption for indirect costs

The illustrations above showed how:

  • Fixed overheads are allocated or apportioned into production departments

  • An overhead absorption rate is calculated (usually per labour hour or per machine hour)

  • Overheads will be charged back to production using the same basis as used to work out the absorption rate.

It is important to understand that overhead absorption rates are calculated in advance on the basis of budgeted costs and budgeted output because a rate is needed from the very start of the period and only budgeted amounts will be known then.

The predetermined absorption rate is then never adjusted retrospectively.

This will usually mean that the actual fixed costs are not properly accounted for and that a final adjustment is needed in respect of:

  • Under-absorption   – where not enough fixed costs have been accounted for.

  • Over-absorption   – where too many fixed costs have been accounted for.

Budgeted fixed costs = $100,000

Budgeted output = 50,000 units

Therefore, fixed overhead absorption rate per unit = $2

Actual fixed costs = $120,000

Actual production = 53,000 units.

Here, the 53,000 units produced will each absorb (account for) $2, so, $2 x 53,000 = $106,000 fixed costs will be accounted for in the cost of production. However, actual fixed costs are $120,000, so the costs have been under-absorbed by $14,000 and a deduction of this amount has to be made from profits.

If results had been:

Actual fixed costs = $95,000

Actual production = 49,000 units.

Here, the 49,000 units produced will each absorb (account for) $2, so, $2 x 49,000 = $98,000 fixed costs will be accounted for in the cost of production. However, actual fixed costs are $95,000, so the costs have been over-absorbed by $3,000 and $3,000 has to be added back to profits

Practice question

Budgeted overheads = $12,000; budgeted production = 2,000 units

Actual overheads = $13,000; actual production = 1,900 units.

Which of the following is correct?

Practice question

Budgeted overheads = $50,000; budgeted production = 20,000 units

Actual overheads = $46,000; actual production = 19,000 units.

Which of the following is correct?

Practice questions

Accounting for Other Expenses

10 questions

Answer the questions one at a time. Your progress is saved so you can leave and come back.

Open chapter practice