Skip to content

Ask the Tutor ACCA PM

section c

Xxyzc5y ago
truffle co (12/12) For part a) of this question, how to calculate the labour cost per hour
John MoffatJohn MoffatTutor5y ago#1
Each batch takes 0.5 hours. The labour cost of each batch is $6.00. Therefore the standard cost per hour is 6.00/0.5 = $12.
Sign into reply to this topic.