From the budget, the standard hours per unit are 8,000 / 20,000 = 0.4 hours per unit.
Therefore, the 25,000 units actually produced should have taken 25,000 x 0.4 = 10,000 hours. They actually took 11,000 hours, and so the efficiency ratio. is 10,000/11,000 = 90.9%