Could someone please let me know how they arrived at the estimated cost of 31.30?
ACCA Forums
PMKaplan Revision Kit – Sep 2016 exam qn (Helot Co) – Pg 83 (Sec B)
Production costs per unit
$
Direct material
3.00
Direct labour
2.50
Direct machining
5.05
Set-up
0.45
Inspection and testing
4.30
Total non-production costs
$000
Design (salaries and technology)
2,500
Marketing consultants
1,700
Distribution
1,400
Add all production costs to arrive at 15.3
Add all non prod. cost to arrive at 16 (5600000/350000)
Total unit cost is therefore 31.3
Thanks a lot.
Thanks a lot.