Traceable are costs that can be identified as being costs of the division. Controllable are costs that the manager of the division controls (as against being controlled by head office).
Author
Posts
Viewing 2 posts - 1 through 2 (of 2 total)
The topic ‘Traceable v/s controllable!’ is closed to new replies.