Skip to content
ACCA exam results — Are you ready?Chat about it >>

Ask the Tutor ACCA PM

Standard cost

KKanan5y ago
when we calculate direct material kg per unit do we consider any loss, spillage and waste? when we calculate direct labour hour per unit do we consider idle time in calculation? Thanks in advance.
John MoffatJohn MoffatTutor5y ago#1
Yes (depending on what is stated in the question).
KKanan5y ago#2
The Three Star Company produces a product known as product X. The company uses a standard costing system and provides you the following information: Direct materials required to produce one unit of product X: 6 pounds Standard cost of direct materials: $10 per pound Normal wastage while producing one unit of product X: 0.5 pounds Based on the above information, what is the standard direct materials cost per unit of product X? $60 $65 $50 $55 Wastage should be built into standards-there are two criterion 1) If wastage occurs before production it should be built into the purchase budget 2)it if occurs during production it needs to be built into the production budget From the 2, the loss occurs in the production process and I restore it. 6*10+0.5*6=65 The following information belongs to John Manufacturing Company that uses a standard costing system: Basic wage rate: $12 per hour Fringe benefits: $2 per hour Basic time: 2 hours per unit Allowance for down time: 0.3 hours per unit Allowance for brakes: 0.2 hours per unit Based on the above information, what is the standard direct labor cost per unit? $35 $28 $30 $32.2 Allowance for down time and for brakes, here idle time is a part of direct production process therefore we consider both of them. 12+2*(2+0.3+0.2=35 fringes employment taxes and any taxes relating to wages and overtime are all included to direct standard cost card?
John MoffatJohn MoffatTutor5y ago#3
Both your answers seem to be correct. Taxes in the second question would be irrelevant - it is the employees who suffer the tax on their wages, not the company.
KKanan5y ago#4
Dear Tutor, in the formation of standard cost card for labor cost per unit, I include idle time(if idle time related to production process because not idle time is relevant) such as Allowance for down time, Allowance for brakes, fringe benefits and so on. what about then "overtime premium"? tax and other deductions-as you said above it is irrelevant why?
John MoffatJohn MoffatTutor5y ago#5
Overtime is not included because it is not something that will normally happen. I have explained why tax is irrelevant - tax is suffered by the employee not by the company. It doesn't effect the cost of labour to the company.
KKanan5y ago#6
Understood Dear Tutor.
John MoffatJohn MoffatTutor5y ago#7
You are welcome :-)
This topic is locked — no new replies.