[Content removed at user request]
Ask the Tutor ACCA PM
shoe co(2016)
In real life there can be occasions when we might decide to ignore some non-relevant costs.
However the examiner has made it clear that for the exam life-cycle costing is not a relevant cost exercise and that we should include all costs over the life of the product.
Sign into reply to this topic.
