[Content removed at user request]
Ask the Tutor ACCA AFM
Project Duration
But either approach gives the same answer.
Multiplying by the PV's and then dividing by the total PV, is the same as multiplying by the PV as a % of the total PV.
Sign into reply to this topic.
