The answer certainly is correct – they have simply missed the brackets in part of the workings (but in the exam your workings for the MCQ’s are not even looked at).
The throughput per factory hour = (320 – 80) / (6/60) = 2,400.
I do suggest that you watch my free lectures on throughput accounting.