sir this is silly doubt, just a small confusion
i have wriiten in my short notes tht irr is maximum return v can expect from the project.
os it coorect sir??
Ask the Tutor ACCA FM
irr
No it is not correct. The IRR is the rate of interest at which the NPV is zero.
The return from the project might be higher or lower than the IRR.
Sign into reply to this topic.
