Activity level Total costs
500 4000
1000 6000
1500 10000
Fixed cost is stepped up after 1000 units. calculate total cost for:
a:800
b:2000
can any 1 please solve this problem
Other Accountancy Qualifications
High low method fixed stepped cost
first, the stepped up fixed cost of 1000 will b deducted from the total cost of 10000, i.e 10000-1000= 9000
now perform your high and low analysis, (9000-4000)/(1500-500)= 5. this is your variable cost per unit.
remember your formula, y=a+bx. Y=total cost, a=fixed cost n b=variable cost.
Now, finding our A, u can use either of d high or low activity level. Lets use the high here,
9000=a+(5*1500). 9000=a+7500, a=9000-7500, a=1500.
now, A=1500 is your fixed cost before step and (1500+1000)= 2500 is your fixed cost after step up.
now determine your total cost of 800 and 2000.
Use this formulas: TC=1500+5(x) for cost below the step up and TC=2500+5(x) for cost above the step up.
For 800, which is below the stepup, we use TC= 1500+(5*800) which will give you a total cost of 5500; while for 2000 which is above the stepup, we use TC= 2500+(5*2000) which will give you a cost of 12500. That is all, i hope this helps.
i am thankful to you Haywhai08
could you please define stepped fixed cost why we use this cost in high low method ?
Haywhai08 your answer is wrong today in class i checked from my class teacher he said this is wrong answer..
the variable per unit cost is 4 not 5
fixed cost for no 1 is $ 2000
fixed cost for no 2 is $4000
A:800 UNITS: $2000+800*4=$5200
B:2000 UNITS:$4000+2000*$12000
THE CORRECT ANSWER OF THAT PROBLEMS OF STEPPED FIXED COST..
i would like to see his workings, especially how the teacher got his variable cost per unit amd how the effect of the step up was reflected in the calculation.
Activity level Total costs
1000 6000
1500 8750
2000 10500
Fixed cost is stepped up at 1500 units. calculate total cost for 500 units.
please solve
Sign into reply to this topic.