Hi sir,
When in scenario it says using Cost plus method
Does it mean total cost plus or variable cost plus?
Thanka
Ask the Tutor ACCA APM
Cost plus method
It should usually mean full cost (ie, total absorption cost) plus.
Sign into reply to this topic.
