sir,i calculated the variable overhead variance like this.please tell me whether it is the right way or not?Thanks in advance
actual variable overheads 87,348
less: actual at standard rate 89,000
(8900*5*2) =1652F
Ask the Tutor ACCA PM
Basic variance analysis 2nd lecture
It is correct (and is what I do in my lecture). However that is the total variable overhead variance and in the exam you will be asked to analyse it. I explain the analysis in my lectures.
Thankyou sir