Skip to content

Ask the Tutor ACCA PM

ABC (Environmental costing)

Vvinaz180910y ago
Hi sir, I just wanted to ask whats the different between environmental related cost and environmental driven cost
John MoffatJohn MoffatTutor10y ago#1
Basically, environmental related costs are costs that the business itself controls (such as the amount of waste generated). Environmental driven costs are costs caused by the environment (such as the need to spend money on heating if the weather is cold).
Sign into reply to this topic.