In the ABC technique, we have total overheads given with each cost driver to allocate to each product.
But I want to ask that whether these overheads are variable or fixed (or it could be both which doesn't matter)???
I guess it is fixed overheads. Isn't it?
Ask the Tutor ACCA PM
ABC
Although it is primarily concerned with absorbing fixed overheads, the same approach can be used sometimes for variable overheads.
Sign in to reply to this topic.
