Skip to content
ACCA exam results — Are you ready?Chat about it >>

Ask the Tutor ACCA PM

ABC

JJohn4y ago
In the ABC technique, we have total overheads given with each cost driver to allocate to each product. But I want to ask that whether these overheads are variable or fixed (or it could be both which doesn't matter)??? I guess it is fixed overheads. Isn't it?
John MoffatJohn MoffatTutor4y ago#1
Although it is primarily concerned with absorbing fixed overheads, the same approach can be used sometimes for variable overheads.
Sign in to reply to this topic.