Skip to contentSkip to search

Option to redeploy

An option to redeploy lets management redirect an asset, facility or project to a more valuable use when circumstances change. Some switching options concern inputs or outputs; others involve moving equipment or capacity between activities. The benefit is the value of the best feasible alternative less the costs and consequences of changing use. It depends on actual technical capacity, contractual rights, timing and market demand. A real-options valuation should not count flexibility again if the underlying forecast already includes the same conditional switch.

Worked example

A factory can switch a production line from product A to product B for $100,000. If the present value of future cash flows is $800,000 under A and $1 million under B, switching offers $100,000 incremental value before other relevant differences and constraints.

Common mistake

Using the gross value of the alternative without deducting switching costs, or treating an unavailable technical change as a real option.

Where it appears in your exams

QualificationExamRelationshipPeriod
ACCA AFM Direct September 2026–June 2027