• Skip to primary navigation
  • Skip to main content
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
    • BT
    • MA
    • FA
    • LW
    • PM
    • TX-UK
    • FR
    • AA
    • FM
    • SBL
    • SBR
    • AAA
    • AFM
    • APM
    • ATX
    • Dates
    • What is ACCA

June 2025 ACCA Exams

How was your exam? Comments & Instant poll >>

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for September 2025 exams.
Get your discount code >>

ACCA F5 Activity Based Costing – Lecture 2 Example 1b

VIVA

Reader Interactions

Comments

  1. koffeeEnam says

    April 30, 2020 at 4:13 am

    Hello Mr Moffat, I just realised that the overhead cost per unit for product A is supposed to be $8.90(78040/20000). hence, there will be a loss os $(3.90)

    Log in to Reply
    • John Moffat says

      April 30, 2020 at 8:59 am

      Not true.

      78040/20000 = 3.90 (not 8.90) and this is the overhead cost per unit, not a loss.

      There is a profit of 1.10 per unit. Watch the lecture again or check the printed answer at the end of our free lecture notes.

      Log in to Reply
  2. mokgola says

    February 6, 2018 at 10:52 am

    Good day Sir.
    I have a question why are we treating Machining cost differently from the rest of the cost pools? Why are we firstly calculating total machine hours for each product rather than just adding up all machine hour per unit of each product?

    Log in to Reply
    • John Moffat says

      February 6, 2018 at 8:37 pm

      We are not treating it differently.

      We find the total of each activity – the total of all the set-ups; the total of all the machine hours, etc.. Do watch the lecture again because I do explain this and stress how important it is to watch out for it.

      Log in to Reply
  3. loukasierides says

    January 3, 2018 at 7:36 pm

    Dear Sir,

    Thank you for a clear and comprehensive lecture

    Log in to Reply
    • John Moffat says

      January 3, 2018 at 11:09 pm

      Thank you for the comment

      Log in to Reply
  4. nadiranks says

    December 19, 2017 at 9:30 pm

    hi one question…in example 1 above calculating using abc, the receiving overhead is calculated as 30000/22 = 1363.636 in the above answer it was rounded off to 1364 per delivery..this makes the total amount of abc (a=13640 b=13640 c=2728) when calculated to be 30008.. This kind of throws me off…Is it ok to apportion it as 10/22 x 30000 to get a more precise figure or should it be done as shown? thank you…

    Log in to Reply
    • John Moffat says

      December 20, 2017 at 8:44 am

      But as I explain in the lecture, when you later calculate the overheads per unit (which is the ultimate aim), then the rounding makes no difference at all because we calculated the cost per unit to the nearest cent.

      Log in to Reply
      • nadiranks says

        December 20, 2017 at 3:08 pm

        awwwww i must have missed that as I was trying to complete the question on my own the second time around….it just seemed easier to do it the other way as i dont want to get confused along the way when doing other questions..after alla one cent does make a difference in accounting ..lol…il go over that lecture again..thanks much…

      • John Moffat says

        December 20, 2017 at 5:39 pm

        You are welcome 🙂

  5. samad92 says

    November 30, 2017 at 9:31 am

    Thank you so much sir, for the wonderful lecture.

    Log in to Reply
    • John Moffat says

      November 30, 2017 at 1:23 pm

      Thank you for your comment 🙂

      Log in to Reply
  6. trang104 says

    November 29, 2017 at 4:59 am

    Good day Mr. Moffat,

    For the poor student like me. You have give me a huge advantageous to self-study ACCA. God blesses you, sir.

    Kind regards,
    Trang

    Log in to Reply
    • John Moffat says

      November 29, 2017 at 9:55 am

      Thank you for your comment 🙂

      Log in to Reply
  7. nomadd says

    October 19, 2017 at 4:17 pm

    Sir, what does machining means ? Like I understand the terms like set up cost … receivables… Despatch. But what does machining means? Why it’s coming under the category of overhead?

    Log in to Reply
  8. ololade2017 says

    July 18, 2017 at 1:02 am

    Thank you for this link. My question is, in real life practice, how do accountant determine the selling price

    Log in to Reply
    • John Moffat says

      July 18, 2017 at 7:52 am

      There is no one way. If you watch the free lectures on pricing then I work through the various things they will consider, and the various techniques they may use.

      Log in to Reply
  9. Samuel Koroma says

    March 27, 2017 at 4:49 pm

    Thank you sir. Indeed ABC is more time consuming when dealing with cost drivers. Separate cost driver rate (OAR) calculated for each activity. Does this make ABC a much more complex method?

    Log in to Reply
  10. Adina says

    March 16, 2017 at 11:51 am

    Hello Mr. Moffat,

    One question, if I may, regarding possible cost drivers. I am trying to solve a problem which mentions : “Distribution costs (all indirect) amount to X$ and are assigned to products by means of the production cost.” Can the production cost be used as a cost driver for the allocation of the distribution costs? I, for instance, considered as cost driver, for this particular allocation, the production – the level of activity for each product. Please let me know your thoughts regarding this.

    Thank you in advance,

    Adina

    Log in to Reply
    • John Moffat says

      March 16, 2017 at 4:47 pm

      If a question says that the production cost is to be used, then you must use the production cost.

      If you are asking whether it is sensible in ‘real-life’, then it depends. There are no rules and it is whatever management feel is the most sensible. The reason cost might be regarded as better than units, is that some products may be bigger than others and therefore cost more to deliver. It is likely that bigger units cost more to produce.

      Log in to Reply
      • Adina says

        March 19, 2017 at 6:08 pm

        Thank you!

      • John Moffat says

        March 20, 2017 at 7:44 am

        You are welcome 🙂

  11. mariogiangrande says

    December 14, 2016 at 8:37 am

    Sir,

    Regarding machining costs:
    Labour hours for B should be 1 hour times 25, 000 units = 25,000 hours and total (A+B+C) 67,000 instead of 94,000. Indeed in your previous lecture the overhead unit cost was $ 2.84/hour, Coming from $190,000/64,000 hours. Am I correct?
    Thanks

    Log in to Reply
    • John Moffat says

      December 14, 2016 at 3:50 pm

      But for machining we need to use machine hours, not about hours.

      Log in to Reply
    • mariogiangrande says

      December 15, 2016 at 6:43 am

      Apologies, I just reviewed my calculations and I was wrong. Hence no need to answer this. Thanks

      Log in to Reply
      • John Moffat says

        December 15, 2016 at 7:38 am

        No problem 🙂

Leave a Reply Cancel reply

You must be logged in to post a comment.

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in