ABCForums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › ABCThis topic has 1 reply, 2 voices, and was last updated 1 year ago by John Moffat.Viewing 2 posts - 1 through 2 (of 2 total)AuthorPosts November 1, 2021 at 11:25 am #639647 John1998mMemberTopics: 62Replies: 36☆☆In the ABC technique, we have total overheads given with each cost driver to allocate to each product.But I want to ask that whether these overheads are variable or fixed (or it could be both which doesn’t matter)???I guess it is fixed overheads. Isn’t it? November 1, 2021 at 2:50 pm #639680 John MoffatKeymasterTopics: 56Replies: 51875☆☆☆☆☆Although it is primarily concerned with absorbing fixed overheads, the same approach can be used sometimes for variable overheads.AuthorPostsViewing 2 posts - 1 through 2 (of 2 total)You must be logged in to reply to this topic.Log In Username: Password: Keep me signed in Log In