• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • FIA Forums
  • CIMA Forums
  • OBU Forums
  • Qualified Members forum
  • Buy/Sell Books
  • All Forums
  • Latest Topics

Save 20% on ACCA & CIMA Books

Interactive BPP books for June 2026 exams, recommended by OpenTuition.
Get discount code >>

279 BPP

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › 279 BPP

  • This topic has 3 replies, 2 voices, and was last updated 2 years ago by AvatarIAW3005.
Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • February 15, 2024 at 5:52 am #700362
    AvatarAnonymous
    Inactive
    • Topics: 53
    • Replies: 46
    • ☆☆

    Hi

    The world commodity prices for cotton increased by 20% in the month of November. At the beginning of the month, the hotel chain made an unexpected request for an immediate design change to the pillowcases. The new design required 10% more cotton than previously. It also resulted in production delays and therefore a shortfall in production of 10,000 pillowcases in total that month.

    The production manager at Bedco is responsible for all buying and any production issues which occur, although they are not responsible for the setting of standard costs.

    we have taken 10% increase in cotton in consideration but not the shortfall of 10k in production .In this question why dont we include this info in calculating the planned/operating variances

    February 15, 2024 at 7:17 am #700379
    AvatarIAW3005
    Keymaster
    • Topics: 4
    • Replies: 1615
    • ☆☆☆☆☆

    The shortfall in production of 10,000 pillowcases is indeed a significant event that would impact the calculation of variances. However, when calculating planned and operational variances, the focus is on the differences between standard and actual usage or costs, rather than the total output levels.

    Therefore, while the shortfall in production is an important factor, it does not directly affect the calculation of material usage planning and operational variances, which are based on the quantity of materials used per unit produced, not the total number of units produced.

    February 15, 2024 at 8:11 am #700391
    AvatarAnonymous
    Inactive
    • Topics: 53
    • Replies: 46
    • ☆☆

    we used the same amount of material but ended up with lower output , it affects labour effiency?

    February 15, 2024 at 12:08 pm #700412
    AvatarIAW3005
    Keymaster
    • Topics: 4
    • Replies: 1615
    • ☆☆☆☆☆

    Look at the question – It only asks for Material

  • Author
    Posts
Viewing 4 posts - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE Exams – Instant Poll

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • TEDI on IAS 16 Property, plant and equipment – Initial Recognition – CIMA F1 Financial Reporting
  • ChanNV on Framework – measurement – ACCA Financial Reporting (FR)
  • ChanNV on IASB Conceptual Framework – Introduction – ACCA Financial Reporting (FR)
  • Konstantinos43 on Financial Performance Measurement – Liquidity Measures – ACCA Management Accounting (MA)
  • Hirak.5 on ACCA TX-UK FA2025 Chapter 3 Property Income and Investments – Individuals

Copyright © 2026 · Contact · Advertising · OpenLicense · About · Sitemap · Privacy Policy · Cookie settings · Comments · Log in