You use the high low method in the normal way, but if one of the levels is over the limit for the step-up in the fixed cost then the difference in the total costs is partly due to the step-up. So subtract the extra fixed cost from the difference – the remainder is the extra variable cost of the extra units. Then continue using the normal logic.