Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › Slack topic
I watched ur lecture on linear programming about slack where you find out slack just by looking at the lines of limited resources at the optimum point on the graph?
If the limited resources line is touching the optimum point (which is Point B in your eg);
Since material and labour lines are touching optimum point it means that we are utilizing all the available material and labour.
Correct?
Correct.