The answer certainly is correct – they have simply missed the brackets in part of the workings (but in the exam your workings for the MCQ’s are not even looked at).
The throughput per factory hour = (320 – 80) / (6/60) = 2,400.
I do suggest that you watch my free lectures on throughput accounting.
Author
Posts
Viewing 2 posts - 1 through 2 (of 2 total)
You must be logged in to reply to this topic.
Cookies
We serve cookies. If you think that's ok, just click "Accept all". You can also choose what kind of cookies you want by clicking "Settings". Read our cookie policy