• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • FIA Forums
  • CIMA Forums
  • OBU Forums
  • Qualified Members forum
  • Buy/Sell Books
  • All Forums
  • Latest Topics

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for June 2026 exams.
Get your discount code >>

learning rate

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › learning rate

  • This topic has 1 reply, 2 voices, and was last updated 10 years ago by John Moffat.
Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • May 29, 2015 at 10:40 am #250133
    muriela
    Member
    • Topics: 2
    • Replies: 6
    • ☆

    Hi,
    Could you please help me with MCQ 39.3 from BPP revision kit?
    “A company began producing a new product in batches four months ago. When production commenced the first batch took 45 hours.
    1month – 1 batch
    2month – 2 batches – 75% learning rate
    3month – 4 batches – 75% learning rate
    4 month – 8 batches – 90% learning rate
    What was the average production time per batch for the first eight batches?”
    Thank you

    May 29, 2015 at 11:58 am #250182
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54835
    • ☆☆☆☆☆

    I think you have misread the question (because you have typed it wrongly).

    The production is not 2 batches in month 2, 4 batches in month 3.

    In month 2 the total to date is 2 batches (so they only made 1 batch in month 2).
    In month 3, the total to date is 4 batches (so they only made 2 batched in month 3)
    And similarly the only made 4 batches in month 4.

    The average time when making 1 is 45 hours.

    The average time when making 2 in total is 45 x 0.75 =33.75 per batch

    The average time when making 4 in total is 33.75 x 0.75 = 25.1325 per batch

    The average time when making 8 in total is 25.1325 x 0.9 = 22.78125 per batch.

  • Author
    Posts
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Kaplan ACCA Free Trial

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE Exams – Instant Poll

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • aksemurtaza5 on Accounting for Limited Companies –  The statement of Profit and Loss – ACCA (FA) lectures
  • John Moffat on Activity Based Costing part 3 – Advantages of, and problems with – ACCA Performance Management (PM)
  • dubsforbill on PPE – revaluation upwards – ACCA Financial Reporting (FR)
  • saaranitinchandratre on Activity Based Costing part 3 – Advantages of, and problems with – ACCA Performance Management (PM)
  • adam on IASB Conceptual Framework – Introduction – ACCA Financial Reporting (FR)

Copyright © 2026 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in