this is because of the optimal production. The optimal point is B (you are given this in the question)Point B is both constraints: Tailors time and FAbric.
You have to find out what the optimal production at this point is:
7W+5L=3500 2W+2L=1200
you have to get rid off either W or L. I will choose W and therefore I will times each by the appropriate number:
7W+5L=3500/x2 2W+2L=1200/x7
14W+10L=7000 14W+14L=8400 4L=1400 L=350
Now take the L (350) and use it in the equat. 2W+2L=1200 2W+ 2(350)=1200 2W+700=1200 2W=500 L=250