Dear P5 tutor,
In Dec 2012 Q4 answer, the operational gearing is 831/110 = 7.6.
I cannot get the fixed cost of 831 after adding all fixed cost 536 + 257 + 30 = 823.
Do you know how to obtain $831m?
Please teach.
Thanks a lot.
I also think the fixed costs are 823. Perhaps 831 is a misprint.