Sir, in the online mock exams on open tuition,
the answer for the cost of dismantling machines at the end of a project Is given as lifecycle costing. But in the practice test, the answer is flow cost accounting.
So incase it comes in the exam, which is the answer that I should be choosing, flow cost accounting or lifecycle costing?
Strictly both answers are true, but flow cost accounting is slightly the better answer 🙂