hi john
for the cvp-
there is a question which says- draw the total cost line on the graph,
Level of activity (units) Fixed costs
0-10000 200,000
10001-15000 300,000
15001- 400,000
variable cost per unit is $4 per unit
I was able to draw the fixed costs on the graph, but the total cost line isa bit difficult
Why is it difficult? It is the fixed cost plus the variable cost.
Have you watched my free lectures?