I am sorry, but I do not have the BPP Study Text – only the Revision Kit – and so I am not able to help you because I cannot see the question or the answer.
(If the variable cost total is for variable costs excluding materials used the the calculation of the total factory cost, then they should use the budgeted total cost (so based on budgeted production) because we assume that all costs except for materials are fixed). I explain this in my free lecture. However, again without seeing the question I cannot be sure that this is the reason.)