• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • CIMA Forums
  • Ask CIMA Tutor
  • FIA
  • OBU
  • Buy/Sell Books
  • All Forums
  • Latest Topics

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for March and June 2025 exams.
Get your discount code >>

BPP Question. Bottleneck and TPAR

Forums › ACCA Forums › ACCA PM Performance Management Forums › BPP Question. Bottleneck and TPAR

  • This topic has 3 replies, 2 voices, and was last updated 10 months ago by mrjonbain.
Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • June 15, 2024 at 9:18 pm #707287
    bazif17
    Participant
    • Topics: 14
    • Replies: 1
    • ☆

    MN Co Manufactures automated industrial trolleys. Each Trolley sells for $2,000 and the material cost per unit is $600. Labour and variable overhead are $5,500 and $8,000 per week respectively. Fixed production costs are $450,000 per year and marketing and administrative cost are $265,000 per year.

    MN Co manufactures automated industrial trolleys. Each trolley sells for $2,000, and the material cost per unit is $600. Labour costs are $5,500 per week, and variable overheads are $8,000 per week. Fixed production costs amount to $450,000 per year, and marketing and administrative costs are $265,000 per year.

    MN Co manufactures automated industrial trolleys. Each trolley sells for $2,000, and the material cost per unit is $600. Labour costs are $5,500 per week, and variable overheads are $8,000 per week. Fixed production costs amount to $450,000 per year, and marketing and administrative costs are $265,000 per year.

    The trolleys are made on three different machines. Machine X makes four frame panels required for each trolley. Its maximum output is 180 frame panels per week. Machine X is old and unreliable and it breaks down from time to time. It is estimated that 20 hours of production are lost per month. Machine Y can manufacture parts for 52 trolleys per week and machine Z, which is old but reasonably reliable, can process and assemble 30 trolleys per week.

    The company has recently introduced a just-in-time (JIT) system and it is company policy to hold little work in progress and no finished goods inventory from week to week. The company operates a 40-hour week, 48 weeks a year.

    Which is the bottleneck machine?

    Answer:

    Machine X loses 20 hours/ mth = 5 hours / week
    loss of 12.5%
    Max output of panels is hence 180 – 12.5% = 158
    No. of trolleys = panels/4 = 39

    Please can you explain where 12.5% comes from and how is 180 – 12.5% equal to 158?

    June 16, 2024 at 8:08 am #707303
    mrjonbain
    Moderator
    • Topics: 6
    • Replies: 2421
    • ☆☆☆☆☆

    For the 12.5%. It comes from reduced output of 5 hours per week. 5/40 × 100 = 12.5%

    June 16, 2024 at 8:12 am #707305
    mrjonbain
    Moderator
    • Topics: 6
    • Replies: 2421
    • ☆☆☆☆☆

    For second part of calculation it is easier to take away 12.5% from 100%. This gives 100 -12.5 =87.5%. 180 x 87.5 = 157.5. In my view this should be rounded down to 157. In any event it leads to only 39 trolleys.

    June 16, 2024 at 8:12 am #707306
    mrjonbain
    Moderator
    • Topics: 6
    • Replies: 2421
    • ☆☆☆☆☆

    Hope this helps.

  • Author
    Posts
Viewing 4 posts - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE 2025 Exams

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • azubair on Time Series Analysis – ACCA Management Accounting (MA)
  • Gowri7 on Relevant cash flows for DCF Working capital (examples 2 and 3) – ACCA Financial Management (FM)
  • Govere on The use of ratios and comparisons in auditing
  • John Moffat on Relevant cash flows for DCF Working capital (examples 2 and 3) – ACCA Financial Management (FM)
  • Gowri7 on Relevant cash flows for DCF Working capital (examples 2 and 3) – ACCA Financial Management (FM)

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in