RRabina10y ago
Is the solution correct? Given BEDSHEET PILLOW SQ 2 sq.meter 0.5sq.meter SP $5 $5 AQ 248000sq.meter 95000sq.meter Workings: BEDSHEET PILLOW RSQ- 10% increase = 2*1.1=2.2 =0.5*1.1=0.55 RSP-20%increase =5*1.2=$6 =5*1.2=$6 Actual production 120000 units 180000units Calculation of material usage planning variance BEDSHEET PILLOW SQSP 2*120000*5=1200000 0.5*180000*5=450000 RSQSP 2.2*120000*5=1320000 0.55*180000*5=495000 120000(A) 45000(A) Total planning usage variance: 165000(A) Calculation of material usage operational variance BEDSHEET PILLOW RSQRSP 2.2*120000*6=1584000 0.55*180000*6=594000 AQRSP 248000*6=1488000 95000*6=570000 96000(F) 24000(F) Total material usage operational variance:120000(F)
John MoffatJohn MoffatTutor10y ago#1
Surely you can check yourself to the examiners answer?
RRabina10y ago#2
They have done it differently so I want to know if it is correct too.As you have said different method provides different answer.
John MoffatJohn MoffatTutor10y ago#3
It seems OK. (But you really should not be using old books because of syllabus changes. I assume your books are recent enough so as to contain lots of MCQ's to practice?)
RRabina10y ago#4
okay. Thank you sir
John MoffatJohn MoffatTutor10y ago#5
You are welcome :-)