Good Day Sir
I am having a bit of a challenge with the variance section, please help with the following:
A company manufactures a single product L, for which the standard material cost is as follows.
Material 14kg x$3 =$42/unit
During July, 800 units of L were manufactured, 12 000 kg of material were purchased for $33,600, of which 11,500kg were issued to production.
Co values all inventory at standard cost.
What are the material price and usage variances for July?
Answer is 2,400F & 900A
The method I have been taught to work out my variances is:
Price variance=2,400F
AQxAP 12,000×2.8(33,600/12,000)= 33,600
AQxSP 12,000×3 = 36,000
Materials variance
AQxAP=33,600
SQxSP=11,500×3=34,500 but this is incorrect
Please tell me how to work out SQxSP? Or even how to perhaps apply a different, but effective approach?
Thank you very much
Zuzie
This is the F1 forum. I think you need to epost this on F2
I was just browsing through this forum and saw this post. Shocker!
Definitely an error as I was not aware that I has posted here