• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • CIMA Forums
  • Ask CIMA Tutor
  • FIA
  • OBU
  • Buy/Sell Books
  • All Forums
  • Latest Topics

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for March and June 2025 exams.
Get your discount code >>

answer to :’ assessment of the impact of “somethings” on ‘somethings”‘

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA APM Exams › answer to :’ assessment of the impact of “somethings” on ‘somethings”‘

  • This topic has 1 reply, 2 voices, and was last updated 9 months ago by Ken Garrett.
Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • July 17, 2024 at 10:49 am #708614
    quytuan
    Participant
    • Topics: 116
    • Replies: 46
    • ☆☆

    https://www.accaglobal.com/content/dam/acca/global/PDF-students/acca/p5/exampapers/S19_Specimen_Paper_APM.pdf
    2013 specimen exam
    Part (iv) of the question 1, which ask for an assessment of the impact of this proposed new information system on the three improvement projects, the sample solution identify what the information requirements of each project are and whether or not the new system will meet those requirements. For example, the implementation of initiatives such as just-in-time manufacturing is heavily reliant on an appropriate information system allowing for co-ordination of deliveries and manufacturing schedules in order to meet customer demands.

    https://www.chinaacc.com/upload/html/2015/09/01/zh3e091e9dab374f89a698708afb1b7e97.pdf
    June 2015 exam
    Part (ii) question 1, with the same type of question:”Using the data in Appendix 3, assess the qualitative and quantitative impact on performance management at MS of response 1.”, the sample solution writes about the proposed acitivites that the company should take with the impact of the response at MS.
    I want to ask with the same type of question about ‘ask an assessment of the impact of “somethings” on ‘somethings”‘, both methods for answering are acceptable or we have to base on the scenario to have suitable methods to answer this type of question and cannot use the other method of answering?Thanks

    July 17, 2024 at 12:43 pm #708622
    Ken Garrett
    Keymaster
    • Topics: 10
    • Replies: 10583
    • ☆☆☆☆☆

    2013: if there is a new IS, it will produce new or different information. If the system does not produce relevant information then its effect must be low. If there are three projects being implemented then the effect of the new IS on these will depend on how congruent information needs and information supply are.

    2015: this is not matching information needs and supply. You are presented with the information in Appendix 3 and have to work out how Response 1 might affect qualitative and quantitative performance. That is different to the first example.

    For all questions you have to remain flexible. Assess the unique information in the scenario and address the, possibly unique, requirements as accurately as you can. Don’t look for formulaic answers.

  • Author
    Posts
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE 2025 Exams

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • hhys on PM Chapter 4 Questions Environmental Management Accounting
  • singhjyoti on Conceptual Framework – ACCA SBR lecture
  • John Moffat on Time Series Analysis – ACCA Management Accounting (MA)
  • azubair on Time Series Analysis – ACCA Management Accounting (MA)
  • Gowri7 on Relevant cash flows for DCF Working capital (examples 2 and 3) – ACCA Financial Management (FM)

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in