Advantage of AbC costingForums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › Advantage of AbC costingThis topic has 1 reply, 2 voices, and was last updated 2 years ago by John Moffat.Viewing 2 posts - 1 through 2 (of 2 total)AuthorPosts March 12, 2022 at 7:09 pm #651182 Anonymous11MemberTopics: 18Replies: 15☆All overhead costs will be accurately linked with a measurable cost driver which will facilitate the control of all overhead costs.Please explain this statement March 13, 2022 at 8:11 am #651205 John MoffatKeymasterTopics: 57Replies: 54500☆☆☆☆☆If we know what it is that is causing a particular overhead to occur then we are in a better position to be able to control what is spent.I do give examples of this in my free lectures on ABC. Have you watched the lectures? 🙂The lectures are a complete free course for Paper PM and cover everything needed to be able to pass the exam well.AuthorPostsViewing 2 posts - 1 through 2 (of 2 total)You must be logged in to reply to this topic.Log In Username: Password: Keep me signed in Log In