In question Neptune (6/08), the activity based costs amount to 140m in the first year, and grow at 5% pa for the rest of the project’s life. Why are we not including this in the APV calculation?
Also sir, in Proteus co (12/11), we have not accounted for the allocated overhead charge payable by Tyche to Proteus co. Should we also ignore the allocated OHs?
I am also interested about to hear it
Overheads are only relevant if the total overheads increase as a result of doing the project.
If the company simply re-allocates the total overheads between projects (for profit purposes) then it is not relevant (because the total will not have changed).
Since Neptune called them ‘activity-based overheads’ it implied that it was simply a re-allocation of an existing fixed total and is therefore not relevant.
(It was a bit nasty wording it like that in Neptune (it was the previous examiner). In Proteus (which was the current examiner) it is made very clear that it is a reallocation (and is therefore not relevant).)