In Q1 I think the NPV should have been negative as in the next Q part they said assume the NPV for Project E is 0.
WACC was 9% 10.3 x (75/(75+15) + 4(ish) x (15/(75+15))
Beta was 12.6 4% + 1.226 (11% – 4%)
TERP I used the wrong figure so got $4.56 (hopefully did the right calc though)
WC days I got 110 for 2014 Quick Ratio I got like 0.95 so may have mucked that up.