- October 19, 2015 at 2:57 am #277233
Pass!!! 3th attempt but finally PASSED! 😉
September 4, 2015 at 7:14 pm #269865Thank you John,
Sorry for my misunderstanding. I will watch lectures again.Best regards,
Vladimir
September 4, 2015 at 5:12 pm #269856Hello John,
The Question is exactly the same Higgins.I solve the equations:
1.) 0.270P+0.270S < 5400
2.) 0.5P+0.75S < 12000
Multiply 2nd one by 0.54 I derive equation 3.):
3.) 0.275P+0.275S = 6480
Then I get the result S=8000 P=12000But these results are not profit maximising results.
In this way I am trying to get the right answer before making graph. But as I sow these method which I use is wrong in terms of contribution maximising.
In this way I found optimal use of resource but not contribution maximising solution.
August 31, 2015 at 9:21 pm #269359Thank you Mr. Moffat for your expert and soon respond!