@mehtabwattoo said:
One Otq was based on absorption costing + ABC costing + Environmental Costing.
second Otq was based on variances and last OTq was based on Risk and Uncertainty.Whereas first CRQ was on the topic of tranfer Pricing and Second was based on incremental budgeting + Zero Based Budgeting. Overall the paper was fine but it was my first CBE attempt and the typing noise was a concentration distraction. I guess high low method was required in the transfer pricing calculations for both Divisons as the selling and admin costs icnluded both fixed and variable.Let’s wait for the results and hope for best Insha Allah.There was a question on ABC costing in OTQ section where it said to calculate by ABC and there was written that there were environmental costs as well. Do we include environmental cost when calculating ABC?