Forum Replies Created
- AuthorPosts
- September 7, 2023 at 9:09 am #691611
Sorry, June 2013
September 5, 2023 at 6:03 am #691376It is the same question – thanks!
John can you please have a look.
Thanks
September 4, 2023 at 5:56 pm #691334Just an FYI, an element of the question is based on NPV with a requirement to calculate the value of a project that starts in 4 years and proceeds for 15 years and calculating the percentage change in a particular variable that would result in a negative NPV (sale price per unit in this question)
An extremely difficult question all round.
Chapter 10 in OT notes and lecture – is this sufficient to be able to complete the sensitivity of a particular variable?
I could answer approx. 5 out of the 25 marks available on that question. And that’s not to say I would have scored 5/25 in the real exam.
Thanks
September 3, 2023 at 10:51 am #691234Sorry – June 2015 Bento Co
August 26, 2023 at 7:58 pm #690758Thanks John. Lectures are a big help.
August 26, 2023 at 8:05 am #690725The solution calculates basis of 0.46 based on initial inter-bank rate of 4.09%
The same basis of 0.46 was used when the interest rate went up/down by 0.9%
Basis when rate went up: (0.95.01-94.76) = 0.25
Unexpired basis (0.25*2/5) = 0.1(100-4.99) 95.01-0.1 = 94.91
(94.76-94.91)/400*(32*2m) = 24,000 loss
deposit at risk (48m*4.79%*4/12) = 766,400 – 24000 = 742,400
effective (742,400/48m)*12/4 = 4.6%
Loss in 33,600. If i had used the new basis of 0.25 – would I still get the full credit?
In addition, the options calc:
Where is the 94.55 coming from? Why is it not 94.81
I am getting 94.81 from:
100-4.99 = 95.01 – 94.5 (stike price) = basis of 0.51 creating an unexpired basis of 0.2
Futures price = 95.01-0.2 = 94.81 !!!
this question is terrible or has my mind just gone blank!!
August 21, 2023 at 7:34 pm #690426Ok thanks.
In terms of Washi Co, I do not understand which sides of the spread to use when calculating the cross rate. Finding the logic behind the solution difficult.
JPY/EUR 129.2-132.4
ARD/EUR 92.7-95.6Cross rate: 132.4/92.7 = 0.70
Why not 129.2/95.7?
This yields 0.74
I have been through the below thread – just not grasping it.
https://opentuition.com/topic/cross-rates-washi-sep-2018-kaplan-exam-kit/
Thanks
July 4, 2023 at 7:49 am #687621Hi John,
If share exchange amounts to 2.55:1- where is the 18:7 coming from?
I understand 18/7 = 2.55 approx.
How is the 18:7 being calculated?
Thanks
June 3, 2021 at 12:04 pm #622926is this a question from acca related material?
May 15, 2021 at 1:02 pm #620654“Even if you were to be asked such a question in AA (which is unlikely given current exam style and standard)”
This question comes from the AA specimen which I passed – is this a good indicator of performance so far or is the specimen more basic than the thing?
While control risk element is not perfect, considering the rest of my answer, is it of an acceptable quality of the standard expected in AA?
March 22, 2021 at 8:44 pm #614996Tutor, can you send the link to that video. I cant see it on list of videos?
March 17, 2021 at 8:29 am #614579FYI this is in the FR workbook p.249
September 9, 2020 at 10:04 pm #584543Yes I got the same. Did you include advertising costs when calculating profit for the variance question?
Struggled with the veggie pot target cost question too.
Found it extremely difficult – been studying for 5 months.
It was a tough one.
September 4, 2020 at 4:13 pm #583465That is, the receipt of 500,000 in 6 months.
In the solution, only the 300,000 payment was hedged.
I would have thought the net amt would have been hedged.
September 3, 2020 at 9:22 pm #583305Ps I understand the straight line equation to be y=a+bx
August 9, 2020 at 7:18 pm #579765I got the 0.05 by calculating – 60mins/1200units.
August 17, 2019 at 1:01 pm #527863Hi, can you please help me with the below question:
Can you please explain why the below solution is different to what we are being taught?
A company uses weighted average method to value its WIP, following information is available :
Regarding Process X of the company:
Value Opening WIP 660units $990
Units added in period 1,500units $2,250
Units transferred to Process Y 1,050 $1,575If the units are 50% complete for material, what is the value of closing WIP of Process X for
period 1?A $1,110
B $832.50
C $1,665
D $1,125I calculate E.U (660+1050+(1110*50%) = 2265
Total Process Costs = (990+2250) = 3240
Cost per EU = 3240/2265 = 1.43
Closing WIP = (1110*50%)*1.43 = 793.65SOLUTION
Value of closing WIP = Value of opening WIP + Value of units transferred into the process – Value of units transferred out of the process = $990 + $2,250 – $1,575 = $1,665.
- AuthorPosts