I think it said the warehouse was bought/started trading at the beginning of the FY and was expecting to have the same level of trade as the other 4 sites. I got $2.25m multiplying the 2 bits by 1.25 separately and kept wondering if it was too simple! Felt wrong that both parts would need to be multiplied by the same number?
Anyone else struggle with calculating the savings on staff costs for the shoe factory? It listed total staff costs for each dept then said they were reducing warehouse staff from 8 to 1 which was fine, but then it said IT was increasing by 0.5 people and other depts were increasing by 0.75 without giving original numbers of staff? Or did I miss something??