• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • FIA Forums
  • CIMA Forums
  • OBU Forums
  • Qualified Members forum
  • Buy/Sell Books
  • All Forums
  • Latest Topics

March 2026 ACCA Exams Results

Comments & Instant poll

Save 20% on ACCA & CIMA Books

Interactive BPP books for June 2026 exams, recommended by OpenTuition.
Get discount code >>

section a

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › section a

  • This topic has 3 replies, 2 voices, and was last updated 4 years ago by AvatarJohn Moffat.
Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • September 8, 2021 at 3:38 pm #634916
    Avatarxyzc
    Participant
    • Topics: 413
    • Replies: 175
    • ☆☆☆☆

    A company manufactures product A using four machines. The time taken by each unit of product A in each of the machines is given. Maximum weekly demand for product a is 500 units
    Machine 1 2 3 4
    Machine capacity (hours) 100 80 40 30
    Hours 0.3 0.5 0.2 0.9
    Increasing the capacity of which machine will increase the throughput accounting ratio.

    If I calculate the capacity of each of the machines by multiplying the hours per unit by the demand then I get 150 250 100 450 which suggests that all of the resources are bottleneck

    Should I multiply the hours per unit by 500 or should I divide the capacity by the hours per unit

    September 8, 2021 at 4:12 pm #634937
    AvatarJohn Moffat
    Keymaster
    • Topics: 57
    • Replies: 54836
    • ☆☆☆☆☆

    You should calculate the maximum that can be produced by each of the machines. Whichever machine gives the lowest is the bottleneck machine.

    September 8, 2021 at 5:02 pm #634944
    Avatarxyzc
    Participant
    • Topics: 413
    • Replies: 175
    • ☆☆☆☆

    Why would the capacity of each of the machines not be compared to the demand to determine which machine is the bottleneck.
    Also if I multiply the hours per unit for each of the machines by the demand and then the subtract the values from the capacity of each of the machines and then the machine which has the highest shortage of hours to meet demand is the bottleneck. Is this correct

    September 9, 2021 at 7:09 am #635031
    AvatarJohn Moffat
    Keymaster
    • Topics: 57
    • Replies: 54836
    • ☆☆☆☆☆

    Yes – it will come to the same conclusion 🙂

  • Author
    Posts
Viewing 4 posts - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE Exams – Instant Poll

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • mrjonbain on Sources of data – ACCA Management Accounting (MA)
  • mrjonbain on Audit Evidence – ACCA Audit and Assurance (AA)
  • jessejames on Audit Evidence – ACCA Audit and Assurance (AA)
  • Princek23 on FR Revision Mock Exam
  • AllisonHoang on Sources of data – ACCA Management Accounting (MA)

Copyright © 2026 · Contact · Advertising · OpenLicense · About · Sitemap · Privacy Policy · Cookie settings · Comments · Log in