I am having problems figuring out the unexpired basis risk. I’m sure I am overlooking something simple.
I can find all the figures to the question except for one.
The steps that I follow are 1. Calculate the number of contracts 2. Calculate the basis 3. Unexpired on Date MM = 2/6 * basis It is the 2/6 that I am not sure on. I have also seen that it could be 1/4.
Is the 2/6 or 1/4 set/standard?
Author
Posts
Viewing 1 post (of 1 total)
You must be logged in to reply to this topic.
Cookies
We serve cookies. If you think that's ok, just click "Accept all". You can also choose what kind of cookies you want by clicking "Settings". Read our cookie policy