- This topic has 1 reply, 2 voices, and was last updated 4 years ago by .
Viewing 2 posts - 1 through 2 (of 2 total)
Viewing 2 posts - 1 through 2 (of 2 total)
- You must be logged in to reply to this topic.
OpenTuition recommends the new interactive BPP books for December 2024 exams.
Get your discount code >>
Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › Throughput vs Throughput/hr
Dear Sir,
Throughput can increase when a bottleneck resource becomes a non-binding constraint, but our throughput per factory hr wouldn’t increase right? It will still remain the same. as our throughput will increase so will the hours so there will be a corresponding change in numerator and denominator at the same time. am i right sir??
with best regards,
No, that is not correct.
The throughput per hour is the throughput (selling price less material cost) per unit divided by the hours per unit. If they are able to produce more then the denominator will increase but the numerator is not changed.