• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • CIMA Forums
  • Ask CIMA Tutor
  • FIA
  • OBU
  • Buy/Sell Books
  • All Forums
  • Latest Topics

June 2025 ACCA Exams

How was your exam? Comments & Instant poll >>

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for September 2025 exams.
Get your discount code >>

Chapter 15 example 2, planning variance

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › Chapter 15 example 2, planning variance

  • This topic has 1 reply, 2 voices, and was last updated 13 years ago by John Moffat.
Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • April 9, 2012 at 1:52 pm #52115
    AmbitiousMe
    Member
    • Topics: 7
    • Replies: 7
    • ☆

    John

    I need you your help with my understanding of planning variances. Is planning variance not the variance between original budget and revised budget based on budgeted production? If so (which I think is the case), detailed planning variances with regard to Example 1 should be as follows:

     
    $
     
    Original budget contribution 43,000
    Planning variances
    Material - usage (5,000 x (1-1.2) x 1) 1,000A
    Material - Price (5000 x 1.2 x (1-.95))) 300F
    Labour – rate (5,000 x 2 x (2.5-2.6)) 1,000A
    Sales – volume (5,000 x .1 x 8.26) 4,130A
    Revised budget contribution (check 4,500 x 8.26) 37,170

    It adds perfectly and it all makes sense (i.e. planning variances based on budgeted production of 5,000 units and not based on actual production of 5,200 units).

    Problem starts when I move to example 2. In example 2 you have taken actual production of 24,000 units instead of budgeted production of 20,000 units to calculate planning variance. Is this a mistake or is there something wrong with my understanding of planning variance.

    Based on my understanding as illustrated above. Planning variance should be 25,000 F:

    $
    Original budget material cost (20,000 x 32)640,000
    Planning variances
    Material - usage (20,000 x (8-7.5) x 4)40,000F
    Material - Price (20,000 x 7.5 x (4-4.1))15,000A
    Revised budget material costs (check 20,000 x 7.5 x 4.1)615,000

    If there was no budgeted procution given, then I would have assumed that budgted production was the same as actual production. But in your example you have given budgeted production of 20,000 units, then why to use 24,000 of actual production to calculate planning variance?

    If my above calculation of example 2 is wrong, then calculation of example 1 has to be wrong. If this is the case then could you please tell me the correct answer to example 1 (i.e. detailed planning variances only).

    April 9, 2012 at 4:25 pm #96091
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54684
    • ☆☆☆☆☆

    Yours is a good question, and different books do it different ways (and get different answers 🙂 )

    The way that example 2 does it is the way the previous examiner said that he preferred in a Student Accountant article (and the way the current examiner will expect it). That is that you do the planning and operational variances based on the actual production.

    This effectively means dealing with the volume variance first – both planning and operational. In example 1 the planning volume variance would be 4300 (A) (that is 500 units x 8.60 per unit) and the operational volume variance would be 6020 (F) (that is 5200 – 4500 = 700 units x 8,60).

    It does mean that you cannot this way get to the 37170 revised budget contribution.

    I am sorry if it is confusing, but it is example 2 that you should concentrate on – anything in the exam is going to be more of an extract (e.g. what are the planning and operation variances for materials, or for labour) and the examiner expects you to do both of them based on the actual level of production.

    Since you have obviously spotted the problem – well done – you can see why different authors prefer different ways 🙂

  • Author
    Posts
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE 2025 Exams

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • EricObi on IAS 37 – Best estimate – ACCA Financial Reporting (FR)
  • Ken Garrett on The nature and structure of organisations – ACCA Paper BT
  • John Moffat on MA Chapter 4 Questions Cost Classification and Behaviour
  • maryrena77 on The nature and structure of organisations – ACCA Paper BT
  • vi234 on MA Chapter 4 Questions Cost Classification and Behaviour

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in