In June 2019 CBE exam there was a question where it said to calculate total cost per unit based on ABC. In addition there was a note indicating that 10% of inspection costs, 30% of machine set-up costs and 20% of general overhead cost were environmental costs. The question is should we include environmental costs in total cost per unit by ABC or should we substract them. Thanks!