What entry is required for recording 12500 as absorbed overhead as their is under absorption of 500? a.DR PRODUCTION OVERHEAD 12500 CR WORK IN PROGRESS 12500 b.DR PRODUCTION OVERHEAD 12500 CR CASH 12000 CR WORK IN PROGRESS 500 c.DR WORK IN PROGRESS 12500 CR PRODUCTION OVERHEAD 12500 d.DR WORK IN PROGRESS 12000 DR PRODUCTION OVERHEAD 500 CR CASH 12500 CAN SOMEBODY ANSWER ME AS I HAD FACE IT IN EXAM.