Sir, In the solution to this part of the question I have taken the total cost of material applicable to the total units and also done same for the labour while charging overhead I have divided the total OH cost with the total cost of labour charged to all to the units, resulting in the slightly different (difference is after the decimal place). Is this acceptable or the way I have solved with is correct?