• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Free ACCA & CIMA online courses from OpenTuition

Free ACCA & CIMA online courses from OpenTuition

Free Notes, Lectures, Tests and Forums for ACCA and CIMA exams

  • ACCA
  • CIMA
  • FIA
  • OBU
  • Books
  • Forums
  • Ask AI
  • Search
  • Register
  • Login
  • ACCA Forums
  • Ask ACCA Tutor
  • CIMA Forums
  • Ask CIMA Tutor
  • FIA
  • OBU
  • Buy/Sell Books
  • All Forums
  • Latest Topics

20% off ACCA & CIMA Books

OpenTuition recommends the new interactive BPP books for March and June 2025 exams.
Get your discount code >>

Yield variance

Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA PM Exams › Yield variance

  • This topic has 6 replies, 3 voices, and was last updated 8 years ago by John Moffat.
Viewing 7 posts - 1 through 7 (of 7 total)
  • Author
    Posts
  • September 1, 2016 at 7:00 pm #336884
    sudeepthapa80
    Member
    • Topics: 11
    • Replies: 17
    • ☆

    A mix of three materials into a process produces 0.9 litres of a finished product, with 10% loss of in put in the process. Standard material cost are as follows per 0.9 litres of output.

    Material $

    X 0.5 litres at $2 per litre. 1.00
    Y. 0.4. Litres at $ 1.5 per litre. 0.60
    Z 0.1 Litres at $ 4 per litre. 0.40

    During a control period, 4000 litres of output were produced. These used 2,810 litres of Material X, 1910 litres of Material Y, and 380 litres of Material Z

    Yield variance ?

    Answer
    Litres of input
    4000 litres of output require (* 10/9) 4444.44
    They did require 5100.00
    Yield variance in litres of input material. 666.56 (A)

    Standard weighted average price per litre of input $2
    Yield. Variance. $ 1311(A)

    THIS ANSWER ARE CALCULATED THE YIELD IN TERM OF LITRES INPUT , COULD YOU PLEASE HELP ME HOW TO CALCULATE THIS IN TERM OF LITRES OF OUT PUT

    September 1, 2016 at 7:28 pm #336911
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54662
    • ☆☆☆☆☆

    But why? The answer is correct!

    Have you watched my free lectures on mix and yield variances?

    September 1, 2016 at 11:16 pm #336937
    sudeepthapa80
    Member
    • Topics: 11
    • Replies: 17
    • ☆

    Yes sir, I have watched all of your videos. I have got the answer following the method demonstrated by you. However, I was wondering why I am not getting the Same correct answer using the other method. I shall be grateful if you could kindly guide me where I am making the error in the following solution.
    Thanks

    5001 should Yield (5001/(10/9)- 4500.9
    They did yield. 4000
    500.9
    *$2
    1001.8

    September 2, 2016 at 6:17 am #336959
    thiran
    Member
    • Topics: 9
    • Replies: 15
    • ☆

    I think you should use Std. Material cost per unit if you calculate material yield variance based on input..
    Here it is,
    5100kg of materials should have yielded (5100*90/100) = 4590
    But did yield = 4000
    Variance in units = 590
    * Std. Material cost per unit (2/0.9) = 2.22
    Variance in $ = $1311

    I think we should arrive at unit cost dividing total cost of input by expected output which is 0.9kg in this example. By doing so we absorbed the cost of 0.1kg- which is the normal loss – into production cost. That’s what we did in F2 when we do ‘Process Costing’..

    I think this is the reason. Sir please correct me if I’m wrong 🙂

    September 2, 2016 at 7:19 am #336978
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54662
    • ☆☆☆☆☆

    There are two ways of getting the same answer.

    The alternative is as follows:

    The standard cost of the actual total input (5,100) at standard mix is:

    X: 0.5 x 5,100 = 2,550 x $2 = 5,100
    Y: 0.4 x 5,100 = 2,040 x $1.5 = 3,060
    Z: 0.1 x 5,100 = 510 x $4 = 2,040

    Total: $10,200

    The standard total input for the actual output of 4,000 = 1/0.9 x 4,000 = 4,444.4
    X: 0.5 x 4,444.4 = 2,222.2 x $2 = 4,444.4
    Y: 0.4 x 4,444.4 = 1,777.8 x $1.5 = 2,666.7
    Z: 0.1 x 4,444.4 = 444.4 x $4 = 1,777.6

    Total: $8,888.7

    Yield variance = the difference = 10,200 – 8,888.7 = $1,311.3

    September 2, 2016 at 5:05 pm #337110
    sudeepthapa80
    Member
    • Topics: 11
    • Replies: 17
    • ☆

    Thank you so much John and thank you thiran your point also helpful

    September 3, 2016 at 7:14 am #337213
    John Moffat
    Keymaster
    • Topics: 57
    • Replies: 54662
    • ☆☆☆☆☆

    You are welcome 🙂

  • Author
    Posts
Viewing 7 posts - 1 through 7 (of 7 total)
  • You must be logged in to reply to this topic.
Log In

Primary Sidebar

Donate
If you have benefited from our materials, please donate

ACCA News:

ACCA My Exam Performance for non-variant

Applied Skills exams is available NOW

ACCA Options:  “Read the Mind of the Marker” articles

Subscribe to ACCA’s Student Accountant Direct

ACCA CBE 2025 Exams

How was your exam, and what was the exam result?

BT CBE exam was.. | MA CBE exam was..
FA CBE exam was.. | LW CBE exam was..

Donate

If you have benefited from OpenTuition please donate.

PQ Magazine

Latest Comments

  • j.akshaya on Group SFP – Example (Basic consolidation) – ACCA Financial Reporting (FR)
  • rishitxx on ACCA BT Chapter 1 – The nature and structure of organisations – Questions
  • singhjyoti on Basic group structures – SPLOCI introduction and example – ACCA (SBR) lectures
  • singhjyoti on Basic group structures – SPLOCI introduction and example – ACCA (SBR) lectures
  • Ken Garrett on Project management – ACCA Strategic Business Leader (SBL)

Copyright © 2025 · Support · Contact · Advertising · OpenLicense · About · Sitemap · Comments · Log in