Forums › Ask ACCA Tutor Forums › Ask the Tutor ACCA MA – FIA FMA › Absorption cost ( fixed overhead are absorbed on Basis of department material
Department S. T
(000). (000)
Allocated AFO. 60. 100
Totat d.material used 120 100
Total labor hours 5. 10
Material
Dept S 3kg@4per kg. 12
Dept T. 2kg@4 per kg. 8
Labour
Dept S. 1/2 hour @10 per hour 5
Dept T 1 1/2 hours @10. 15
Variable OA 1 hour @5 per 5
Total. 45
If fixed overhead are absorbed on the basis department material cost , the fixed overhead cost per uintaite is:
A. 5.5
B 12
C 14
D 21
Kit question 99
I have no idea which kit you are talking about.
Also you have not said where your problem is!!
Overheads are absorbed on the basis of material cost.
So…for department S, total overheads are $60,000; total material cost is 120,000kg x $4 = $480,000. (I am assuming that the material used is in kg – you have not typed the units. If it is in $’s then it does not need multiplying by $4)
So, the absorption rate for department S is 60/480 = $0.125 per $ of material.
In the same way, you can calculate the absorption rate for department T.
To get the cost per unit, for S overheads it will be $0.125 x 12 = $1.50